Calculation of costs

You can choose between three phases of construction:

1. ELEMENTARY PHASE:

The facility is built on a pre-prepared foundation or basement foundation. Exterior walls, partition walls, the ceiling, knee walls, front walls and the roof to the air duct are built. All the insulations, foils, final coating products, building joinery products and all floors of the facility are conducted by the investor himself.

Gross floor area: * m2
Price in  €: Elementary phase
Price in  €: Conceptual plan
Price in  €: Project documentation

All the prices are exclusive of VAT.
Gross floor area is the total area of ​​the ground plan of the storey (ground floor + attic).
Since the price depends on the way and phase of construction, the stage of construction and inbuilt materials, the calculate presents a rough price, according to the surface area of the building. For a more detailed offer, please contact us for more information.

 

2. EXTENDED PHASE:

The facility is built on a pre-prepared foundation or basement foundation. Exterior walls with insulation and final coatings, partition walls with insulation and final coatings, the ceiling construction with a visible ceiling of the ground floor and insulation, the front and knee walls with insulation and final coatings and the roof to the air duct are built. As well as external and internal building and joinery products and attic floor.

Gross floor area: * m2
Price in €: Extended phase
Price in €: Conceptual plan
Price in €: Project documentation

All the prices are exclusive of VAT
Gross floor area is the total area of ​​the ground plan of the storey (ground floor + attic)
* Since the price depends on the way and phase of construction, the stage of construction and inbuilt materials, the calculate presents a rough price, according to the surface area of the building. For a more detailed offer, please contact us for more information.

 

3. TURNKEY PHASE:

The facility is built on a pre-prepared foundation or basement foundation. Exterior walls with insulation and final coatings, partition walls with insulation and final coatings, the ceiling construction with a visible ceiling of the ground floor and insulation, the front and knee walls with insulation and final coatings and the roof to the air duct are built. As well as external and internal building joinery products and attic floor.

The phase also includes the roofing, all the metal roofing products, electric circuits, mechanical circuits, final painting of the building, final inner production, the whole flooring, ceramics and other pre-arranged matters. 

Gross floor area: * m2
Price in €: Turnkey phase
Price in €: Conceptual plan
Price in €: Project documentation

* All the prices are exclusive of VAT
* Gross floor area is the total area of ​​the ground plan of the storey (ground floor + attic)
* Since the price depends on the way and phase of construction, the stage of construction and inbuilt materials, the calculate presents a rough price, according to the surface area of the building. For a more detailed offer, please contact us for more information.

Do you have a question?

Write to us!

CONTACT:

R-CAD d.o.o.
Mariborska 86 (EMO),
3000 Celje, Slovenia

E-mail: info@lesenehise.si
gsm: 031 500 393

Catalogue

Take a look at our catalogue!